Page 6 - 남광토건 브로셔(영문)
P. 6

SURPASSING



                    THE LIMIT OF


                    CONSTRUCTION                     Everybody had doubts. Nobody could put it into action.
                                                     The company that successfully delivered numerous demanding
                                                     projects with leading-edge technology.
                                                     Namkwang E&C has built a life of abundance beyond the limits of
                                                     Korea’s construction.






                   PIONEER SINCE 1947
                       NAMKWANG


























































                                                                                                                                                                                                             Construction for Seoul Subway Line 5 (First subaqueous Tunnel)
   1   2   3   4   5   6   7   8   9   10   11